HF430S | ITIL® Planning, Protection and Optimization (PP&O) (HF430S) | 40 h (5 days) |
HF429S | ITIL® Intermediate: Release, Control and Validation (RC&V) (HF429S) | 40 h (5 days) |
HF428S | ITIL® Operational Support and Analysis (HF428S) | 40 h (5 days) |
HF427S | ITIL® Service Offerings and Agreements (SO&A) (HF427S) | 40 h (5 days) |
HF437S | ITIL® Service Strategy (SS) (HF437S) | 24 h (3 days) |
HF440S | ITIL® Service Operation (SO) (HF440S) | 24 h (3 days) |
HF438S | ITIL® Service Design (SD) (HF438S) | 24 h (3 days) |
HF441S | ITIL® Continual Service Improvement (CSI) (HF441S) | 24 h (3 days) |
HF442S | ITIL® Managing Across the Lifecycle (MALC) (HF442S) | 40 h (5 days) |
HF439S | ITIL® Service Transition (ST) (HF439S) | 24 h (3 days) |
H4C21S | HP ServiceGuard on Linux (H4C21S) | 40 h (5 days) |
H4322S | POSIX Shell Programming (H4322S) | 40 h (5 days) |
H7091S | Enterprise Linux System Administration (H7091S) | 40 h (5 days) |
H7092S | Enterprise Linux Network Services (H7092S) | 40 h (5 days) |
H5875S | HP-UX System and Network Administration for Experienced UNIX® System Administrators (H5875S) | 40 h (5 days) |
H4262S | HP-UX Performance and Tuning (H4262S) | 40 h (5 days) |
H4264S | HP-UX System and Network Troubleshooting (H4264S) | 40 h (5 days) |
H3541S | HP-UX Security (H3541S) | 40 h (5 days) |
HK711S | HP-UX 11i v3 for Experienced HP-UX System Administrators (HK711S) | 16 h (2 days) |
H3065S | HP-UX System and Network Administration II (H3065S) | 40 h (5 days) |
H3064S | HP-UX System and Network Administration I (H3064S) | 40 h (5 days) |
093017 | NCTA Cloud Technologies (093017) | 24 hrs (3 days) |
093018 | NCTA Cloud Operations (093018) | 40 hrs. (5 days) |
093019 | NCTA Cloud Architecture (093019) | 40 hrs. (5 days) |
pm.Praxis | Applied Project Management (pm.Praxis) | 24 h (3 days) |
pm.Risks | Applied Risk Management (pm.Risks) | 16 h (2 days) |
pm.Config | Applied Project Configuration Management (pm.Config) | 7 h (1 day) |
pm.People | Project Manager’s Soft Skills (pm.People) | 16 h (2 days) |
PMBOK+MSProject | Pmbok 5th feat. Microsoft Project Combo Training (PMBOK+MSProject) | 40 h (5 days) |
ms.PPM | Managing Programs and Projects with Project Server 2013 (ms.PPM) | 24 h (3 days) |
ms.Project | Managing Projects with Microsoft Project 2013 Professional (ms.Project) | 24 h (3 days) |
H4S50S | VMware vSAN 5.5: Deploy and Manage (H4S50S) | 16 h (2 days) |
H1L96S | VMware vCenter Site Recovery Manager 5.1: Install, Configure, Manage (H1L96S) | 16 h (2 days) |
HL983S | VMware vCenter Operations Manager: Analyze and Predict (HL983S) | 16 h (2 days) |
H1L98S | VMware vCenter Configuration Manager for Virtual Infrastructure Management (H1L98S) | 24 h (3 days) |
HL977S | VMware vCloud: Deploy and Manage the VMware Cloud (HL977S) | 32 h (4 days) |
H4S38S | VMware vCloud Automation Center: Install, Configure, Manage (H4S38S) | 24 h (3 days) |
H4S27S [VCP-Cloud] | VMware vCloud Director: Install, Configure, Manage [v5.1] (H4S27S) | 24 h (3 days) |
HK797S | VMware vCloud: Overview (HK797S) | 8 h (1 day) |
HK798S | VMware vCloud: Architecting the VMware Cloud (HK798S) | 24 h (3 days) |
H4S49S | vCloud Automation Center 6: Install, Configure, Manage (H4S49S) | 40 h (5 days) |
H9P78S | VMware vCenter Site Recovery Manager 5.8: Install, Configure, Manage (H9P78S) | 16 h (2 days) |
H1L89S | VMware View 5.1 Install, Configure, Manage (H1L89S) | 32 h (4 days) |
H4S26S | VMware View 5.1: Design Best Practices (H4S26S) | 24 h (3 days) |
H1L91S | VMware View 5.0: Desktop Fast Track (H1L91S) | 40 h (5 days) |
H4S32S [VCP5-DT] | VMware Horizon View: Install, Configure, Manage [V5.2] (H4S32S) | 32 h (4 days) |
H6D09S [VCP5-DT] | Horizon (with View): Install, Configure, Manage [V6.0] (H6D09S) | 32 h (4 days) |
Horizon (with View): Install, Configure, Manage [V6] | 32 h (4 days) |
H6D03S [VCP5-DCV] | VMware vSphere: Fast Track [V5.5] (H6D03S) | 40 h (5 days) |
H9P75S | VMware vSphere: What's New [V6.0] (H9P75S) | 16 h (2 days) |
H9P76S [VCP6-DCV] | VMware vSphere: Install Configure Manage [V6.0] (H9P76S) | 40 h (5 days) |
HK991S | VMware vSphere: Exam preparation [V5.5] (HK991S) | 4 h (1/2 day) |
HL237S [VCAP5-DCD] | VMware vSphere: Design Workshop [5.x] (HL237S) | 24 h (3 days) |
H6D02S | VMware vSphere: Optimize & Scale [V5.5] (H6D02S) | 40 h (5 days) |
H6D07S [VCP5-DCV] | VMware vSphere: Troubleshooting Workshop [V5.5] (H6D07S) | 40 h (5 days) |
HK988S | VMware vSphere: Advanced Fast Track (HK988S) | 40 h (5 days) |
HH640S | VMware vSphere: Automation with vSphere PowerCLI (HH640S) | 16 h (2 days) |
H0DR1S | VMware vSphere Bootcamp [V6.0] (H0DR1S) | 40 h (5 days) |
H9P77S [VCP6-DСV] | VMware vSphere: Optimize and Scale [V6.0] (H9P77S) | 40 h (5 days) |